NFPA 285 certifies a tested assembly sequence. On complex commercial facade projects, components change and compliance needs to be re-verified before commitments are made. Lavada provides that coverage through design-assist and shop drawing integration.
Read MoreNFPA 285
How Shop Drawings Reduce RFIs on Facade Projects /
Coordination gaps in construction documents often result in RFIs, delays, and avoidable costs. Lavada’s shop drawing and engineering services identify and resolve conflicts before fabrication, supporting a smoother path from design to installation.
Read MoreBuilding Envelope Systems: Design, Engineering & Performance /
A high-performance building envelope depends on decisions made early in design: the right system selection, coordinated control layers, and specialist involvement before commitments are made. Here is what that looks like in practice, and how Lavada approaches it.
Read More