NFPA 285 Compliant Facade Systems: Specification and Coordination for Commercial Projects /  by Karoline Castrillon

NFPA 285 certifies a tested assembly sequence. On complex commercial facade projects, components change and compliance needs to be re-verified before commitments are made. Lavada provides that coverage through design-assist and shop drawing integration.

Read More

How Shop Drawings Reduce RFIs on Facade Projects /  by Karoline Castrillon

Coordination gaps in construction documents often result in RFIs, delays, and avoidable costs. Lavada’s shop drawing and engineering services identify and resolve conflicts before fabrication, supporting a smoother path from design to installation.

Read More

Building Envelope Systems: Design, Engineering & Performance /  by Karoline Castrillon

A high-performance building envelope depends on decisions made early in design: the right system selection, coordinated control layers, and specialist involvement before commitments are made. Here is what that looks like in practice, and how Lavada approaches it.

Read More

Beyond Cladding: How the +Energy Facade Turns Exterior Walls Into Passive Energy Systems /  by Guest User

Lavada Inc. has partnered with Copa Solar and Cosentino to develop the +Energy Facade — a building-integrated passive heating and cooling system that transforms the exterior wall into an active thermal energy source. Using Dekton ultra-compact surface panels and Copa Solar's proprietary thermal absorber technology, the system delivers heating, cooling, and domestic hot water from a single facade assembly — with zero additional building footprint.

Read More